Five tips for planning a home renovation
Considering a home renovation? These five tips may help in the decision making process.
1. Get recommendations. Personal recommendations from others who have been through a renovation can be helpful. Ask those people in case they know about an architect, project manager, or builder or go online and make the right choice based on the company’s track record.
2. Tackle structural defects first. These issues should be addressed before they become larger concerns. For instance, a leaky, unchecked roof or any electrical problem can cause expensive (and larger) issues in the long run.
3. Know the end goal. Is this a renovation designed to increase resale value? Or is it to improve the comfort for both short- and long-term occupancy? Consider the condition of surrounding homes in the neighbourhood to evaluate what is suitable. Find out which renovations are seen as a good return on investment.
4. Set a budget. A home renovation budget should include the rates for materials, building permits, decorative finishes and labour. Begin by establishing a budget and then securing the financing. It's advisable to reserve a minimum of 10% of the budget for unexpected costs.
5. Create a timeline. Once a start date is established, the contractor should then calculate the amount of time needed for each portion of the project. Priorities can be set and concurrent tasks can be identified. Time should be included for shipping and delivery of materials.
[edit] Related articles on Designing Buildings
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
How orchards can influence planning and development.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Comments